Garden Centre

Back to Case Studies Garden Centre This project was carried out for Dewhurst Utilities as part of the installation of a new substation serving an EV charging station at a garden centre in Speke. The works involved a deep excavation to accommodate a reinforced concrete raft foundation, which required earthing directly into the ground in […]
The Plough Inn

Back to Case Studies The Plough Inn This project was carried out in February 2026 at The Plough Inn in Carnforth for a private client. The works involved the installation of 17no. 203mm piles. Operating within the grounds of an existing pub required careful planning and coordination to ensure safe access and minimal disruption to […]
Dentist

Back to Case Studies Dentist This project was carried out for a dental practice in Rochdale in June 2024. The works involved the installation of 6-inch pile foundations and were completed over three days by a three-man team, delivering efficiently within a busy commercial setting. Careful planning and coordination were required to minimise disruption to […]
Primary school
Back to Case Studies Primary school This project was carried out at Banks Primary School for Bluebell Northwest Ltd in December last year. The works involved installing 6-inch piles for a small extension and were completed over two days by a three-man team, delivering efficiently with minimal disruption to the school environment. Our scope included […]
Lancaster Castle

Back to Case Studies Lancaster Castle K&B Piling were proud to work alongside Quadriga on the demolition and groundworks as part of the renovation works at Lancaster Castle, a Grade I listed historic landmark in Lancashire. Delivering works within such a significant heritage site required a careful, controlled approach to protect the existing stonework and […]
New Build Plots in Preston

Back to Case Studies New Build Plots in Preston This project took place in Preston during October and November last year for Almond Estates. It was one of our larger domestic jobs we have taken on, starting on 29th October and finishing on 18th November, with the full programme completed in just three weeks. The […]
Extensions, Orangeries and Super-structures in Crewe

Back to Case Studies Extensions, Orangeries and Super-structures in Crewe This project was completed in August last year in Crewe for Clearview. Heave protection was required as part of the foundation design due to ground conditions that presented a risk of upward movement. Heave occurs when clay-based soils expand as moisture levels increase, often following […]
Extensions, Orangeries and Super-structures in Warrington

Back to Case Studies Extensions, Orangeries and Super-structures in Warrington This project is a great example of a 4-inch steel case driven mini piling installation completed in Warrington last year. The scheme comprised 9.9 linear metres and six piles which was successfully completed within a single working day. Four-inch piles are typically specified for lighter […]
Extensions, Orangeries and Super-structures in Burnley

Back to Case Studies Extensions, Orangeries and Super-structures in Burnley This underpinning project was completed in July last year in Burnley for Calico Homes. The project involved the installation of 30 piles, making it one of the larger domestic projects, and was completed over a seven-day period. The works were undertaken to strengthen and stabilise […]
Extensions, Orangeries and Super-structures in Stockport

Back to Case Studies Extensions, Orangeries and Super-structures in Stockport This project was completed in Stockport for a private client in July last year. The works were carried out over three days and provide a great example of a 6-inch steel case driven mini-piled foundation for a double-storey wrap-around extension. Six-inch piles are typically specified […]